Work, built to run.
3 projects+3 concepts+ our own site
Real projects, described plainly. Concepts are marked as concepts.
CONCEPT 01.
A system sketch for a grain shipowner. Not delivered work.
Concept
Concept 01 · For Prelude Marine
The clock that bills.
Factories are not the only places where time turns into money. A bulk carrier waiting in port does too. This is a working sketch of the system we would build for a grain shipowner: what is in every hold, and what every hour in port costs.
Act 1
Every hold, seen from the deck.
Move over the hull to look inside.Hold to look inside. Scroll to load 25,000 t.
Five holds. The five cargoes Prelude Marine carries most. Urea and phosphate out, wheat and barley back: the same holds carry what grows the grain, and the grain.
Urea and phosphate out, wheat and barley back: the same holds carry what grows the grain, and the grain.
Same 25,000 t, different space: barley fills 99% of the holds, phosphate 64%.
Stowage factor 1.28 m³/t · typical · One centimetre on the draft marks is about 39 tonnes of cargo.

Your companynext.
Tell us where your time leaks. The next card on this wall could be yours.







